517-432-8220 ncpp@egr.msu.edu
Menu
  • Research ⮟
    • Research Updates & Search Engine
    • Asset Management
    • Materials
    • Inspection
    • Materials
    • Decks
    • TRB AKT60 Standing Committee on Bridge Preservation
  • Technical ⮟
    • AASHTO
    • General
    • Coatings
    • Decks & Joints
    • Maintenance & Inspection
    • Performance Measures
    • Substructures
    • Surveys
    • Tunnels
  • Legislative
  • Training
  • Industry
    • IDP – Innovative Demonstrations Program
    • BP-ETG under Technical
    • Virtual Demonstrations
    • Bridge News
  • Working Groups ⮟
    • Regional / National Working Groups
    • Working Group Products
    • Local Agency – Outreach & Training
    • Pocket Guides
    • Bridge Blog
    • Bridge Product Database
Apply Online

Preventative Maintenance Program for Bridges

2015-09-01
| No Comments

The Kentucky Transportation Center at the University of Kentucky has released a report that considers the tools, training, and plans that will be needed for carrying out preventative maintenance work on bridges.

 Read the Report
Categories: Bridge Design/Const., Bridge Pres. Apps., General News, New Technology, News, Studies / Reports, Treatments

Post navigation

← Mississippi DOT Recalls Major Bridge Work After Katrina, Rebuilding of US 90
RIDOT’s Special Bridge Inspections Lead to Immediate Repairs for Dozens →

Partnership Meetings

2025 Meeting List

Bridge Preservation Blog
Technical Exchange

Technical Exchange

Technical Exchange

Bridge Product Database

Bridge Preservation Partnerships

Fill out the form to be put on our email list for information on upcoming partnership activities.

Sign Up
Contact Us
Email:  ncpp@egr.msu.edu
Phone:  (517) 432-8220
Address
2857 Jolly Road
Okemos, MI 48864
Map
Hours of Operation
8 am - 5 pm
Eastern Time
NCPP 2026