517-432-8220 ncpp@egr.msu.edu
Menu
  • Research ⮟
    • Research Updates & Search Engine
    • Asset Management
    • Materials
    • Inspection
    • Materials
    • Decks
    • TRB AKT60 Standing Committee on Bridge Preservation
  • Technical ⮟
    • AASHTO
    • General
    • Coatings
    • Decks & Joints
    • Maintenance & Inspection
    • Performance Measures
    • Substructures
    • Surveys
    • Tunnels
  • Legislative
  • Training
  • Industry
    • IDP – Innovative Demonstrations Program
    • BP-ETG under Technical
    • Virtual Demonstrations
    • Bridge News
  • Working Groups ⮟
    • Regional / National Working Groups
    • Working Group Products
    • Local Agency – Outreach & Training
    • Pocket Guides
    • Bridge Blog
    • Bridge Product Database
Apply Online

Synthesis on the Use of Accelerated Bridge Construction Approaches for Bridge Rehabilitation

2016-01-21
| No Comments

The Institute for Transportation at Iowa State University has released a report that reviews available rehabilitation alternatives and solutions to complete rapid rehabilitation projects.

Read the Report

Categories: Bridge Design/Const., Bridge Pres. Apps., General News, Legislative / Political, New Technology, News, Studies / Reports

Post navigation

← RFP: Revised Clear-Water and Live-Bed Contraction Scour Analysis
Predicting Fatigue Service Life Extension of RC Bridges with Externally Bonded CFRP Repairs →

Partnership Meetings

2025 Meeting List

Bridge Preservation Blog
Technical Exchange

Technical Exchange

Technical Exchange

Bridge Product Database

Bridge Preservation Partnerships

Fill out the form to be put on our email list for information on upcoming partnership activities.

Sign Up
Contact Us
Email:  ncpp@egr.msu.edu
Phone:  (517) 432-8220
Address
2857 Jolly Road
Okemos, MI 48864
Map
Hours of Operation
8 am - 5 pm
Eastern Time
NCPP 2026