517-432-8220 ncpp@egr.msu.edu
Menu
  • Research ⮟
    • Research Updates & Search Engine
    • Asset Management
    • Materials
    • Inspection
    • Materials
    • Decks
    • TRB AKT60 Standing Committee on Bridge Preservation
  • Technical ⮟
    • AASHTO
    • General
    • Coatings
    • Decks & Joints
    • Maintenance & Inspection
    • Performance Measures
    • Substructures
    • Surveys
    • Tunnels
  • Legislative
  • Training
  • Industry
    • IDP – Innovative Demonstrations Program
    • BP-ETG under Technical
    • Virtual Demonstrations
    • Bridge News
  • Working Groups ⮟
    • Regional / National Working Groups
    • Working Group Products
    • Local Agency – Outreach & Training
    • Pocket Guides
    • Bridge Blog
    • Bridge Product Database
Apply Online

Underwater Noise Reduction of Marine Pile Driving Using a Double Pile: Vashon Ferry Terminal Test

2016-12-14
| No Comments

The Washington State Department of Transportation has released a report that analyzes the underwater sound levels of marine pile driving when using a double-walled pile.

Read the Report

Categories: Bridge Design/Const., Bridge Pres. Apps., General News, New Technology, News, Studies / Reports

Post navigation

← Ensuring Accurate Load Ratings for Shear in Bridges with Prestressed Concrete Girders
Bridge Assessment for High Productivity Freight Vehicle Access: Guidelines on Processes and Procedures →

Partnership Meetings

2025 Meeting List

Bridge Preservation Blog
Technical Exchange

Technical Exchange

Technical Exchange

Bridge Product Database

Bridge Preservation Partnerships

Fill out the form to be put on our email list for information on upcoming partnership activities.

Sign Up
Contact Us
Email:  ncpp@egr.msu.edu
Phone:  (517) 432-8220
Address
2857 Jolly Road
Okemos, MI 48864
Map
Hours of Operation
8 am - 5 pm
Eastern Time
NCPP 2026