517-432-8220 ncpp@egr.msu.edu
Menu
  • Research ⮟
    • Research Updates & Search Engine
    • Asset Management
    • Materials
    • Inspection
    • Materials
    • Decks
    • TRB AKT60 Standing Committee on Bridge Preservation
  • Technical ⮟
    • AASHTO
    • General
    • Coatings
    • Decks & Joints
    • Maintenance & Inspection
    • Performance Measures
    • Substructures
    • Surveys
    • Tunnels
  • Legislative
  • Training
  • Industry
    • IDP – Innovative Demonstrations Program
    • BP-ETG under Technical
    • Virtual Demonstrations
    • Bridge News
  • Working Groups ⮟
    • Regional / National Working Groups
    • Working Group Products
    • Local Agency – Outreach & Training
    • Pocket Guides
    • Bridge Blog
    • Bridge Product Database
Apply Online

Field Demonstration of New Bridge Approach Slab Designs and Performance

2014-06-10
| No Comments

The Louisiana Department of Transportation and Development has released a report that explains its efforts to minimize bridge end bump problems associated with differential settlement.

Read the Report

Categories: Bridge Design/Const., Bridge Pres. Apps., New Technology, News, Studies / Reports

Post navigation

← Delaware DOT Working to Reopen I-495 Bridge Closed Due to Structural Concerns
State of the Practice and Art for Structural Health Monitoring of Bridge Substructures →

Partnership Meetings

2025 Meeting List

Bridge Preservation Blog
Technical Exchange

Technical Exchange

Technical Exchange

Bridge Product Database

Bridge Preservation Partnerships

Fill out the form to be put on our email list for information on upcoming partnership activities.

Sign Up
Contact Us
Email:  ncpp@egr.msu.edu
Phone:  (517) 432-8220
Address
2857 Jolly Road
Okemos, MI 48864
Map
Hours of Operation
8 am - 5 pm
Eastern Time
NCPP 2026