517-432-8220 ncpp@egr.msu.edu
Menu
  • Research ⮟
    • Research Updates & Search Engine
    • Asset Management
    • Materials
    • Inspection
    • Materials
    • Decks
    • TRB AKT60 Standing Committee on Bridge Preservation
  • Technical ⮟
    • AASHTO
    • General
    • Coatings
    • Decks & Joints
    • Maintenance & Inspection
    • Performance Measures
    • Substructures
    • Surveys
    • Tunnels
  • Legislative
  • Training
  • Industry
    • IDP – Innovative Demonstrations Program
    • BP-ETG under Technical
    • Virtual Demonstrations
    • Bridge News
  • Working Groups ⮟
    • Regional / National Working Groups
    • Working Group Products
    • Local Agency – Outreach & Training
    • Pocket Guides
    • Bridge Blog
    • Bridge Product Database
Apply Online

Serviceability-related Issues for Bridge Live Load Deflection and Construction Closure Pours

2015-08-12
| No Comments

The Maryland State Highway Administration has released a report that investigates the design criteria and practices used for improving the quality of bridge designs, including for live load deflection on steel bridges.

 Read the Report
Categories: Bridge Design/Const., Bridge Pres. Apps., New Technology, News, Studies / Reports

Post navigation

← South Dakota Commission Eyes Rules to Launch $15M Local Bridge Grants Fund
Durability Assessment of Prefabricated Bridge Elements and Systems →

Partnership Meetings

2025 Meeting List

Bridge Preservation Blog
Technical Exchange

Technical Exchange

Technical Exchange

Bridge Product Database

Bridge Preservation Partnerships

Fill out the form to be put on our email list for information on upcoming partnership activities.

Sign Up
Contact Us
Email:  ncpp@egr.msu.edu
Phone:  (517) 432-8220
Address
2857 Jolly Road
Okemos, MI 48864
Map
Hours of Operation
8 am - 5 pm
Eastern Time
NCPP 2026