517-432-8220 ncpp@egr.msu.edu
Menu
  • Research ⮟
    • Research Updates & Search Engine
    • Asset Management
    • Materials
    • Inspection
    • Materials
    • Decks
    • TRB AKT60 Standing Committee on Bridge Preservation
  • Technical ⮟
    • AASHTO
    • General
    • Coatings
    • Decks & Joints
    • Maintenance & Inspection
    • Performance Measures
    • Substructures
    • Surveys
    • Tunnels
  • Legislative
  • Training
  • Industry
    • IDP – Innovative Demonstrations Program
    • BP-ETG under Technical
    • Virtual Demonstrations
    • Bridge News
  • Working Groups ⮟
    • Regional / National Working Groups
    • Working Group Products
    • Local Agency – Outreach & Training
    • Pocket Guides
    • Bridge Blog
    • Bridge Product Database
Apply Online

Laboratory Investigation of Grouted Coupler Connection Details for Accelerated Bridge Construction Projects

2015-09-30
| No Comments

The Institute for Transportation at Iowa State University has released a report that evaluates the grouted coupler connection details utilized on precast concrete elements on one of Iowa’s bridges.

Read the Report

Categories: Bridge Design/Const., Bridge Pres. Apps., General News, New Technology, News, Studies / Reports

Post navigation

← Using Expert Opinion to Quantify Accuracy and Reliability of Nondestructive Evaluation (NDE) of Bridges
Repairing/Strengthening of Bridges with Post-tensioned FRP Materials and Performance Evaluation →

Partnership Meetings

2025 Meeting List

Bridge Preservation Blog
Technical Exchange

Technical Exchange

Technical Exchange

Bridge Product Database

Bridge Preservation Partnerships

Fill out the form to be put on our email list for information on upcoming partnership activities.

Sign Up
Contact Us
Email:  ncpp@egr.msu.edu
Phone:  (517) 432-8220
Address
2857 Jolly Road
Okemos, MI 48864
Map
Hours of Operation
8 am - 5 pm
Eastern Time
NCPP 2026